
On Stert Street some of the buildings are being worked on. A sign outside says ‘Open as Usual.’

Underneath the scaffolding, Finishing Touch was open this Sunday, as were a lot of other Abingdon shops – just over a week to go to Christmas.

In the Abbey Shopping Centre the shops are used to being ‘Open As Usual’ having had scaffolding up and work underway most of the year.

Not much of that scaffolding now remains and the reshaped buildings are now visible both sides.

We are still waiting with interest to see what new names may come to Abingdon in the coming months.
Heyfordian Replacement Bus

At the end of another busy week for the Abingdon Town Bus with 72 trips through South Abingdon, 48 trips to Abingdon Community Hospital, and 24 to the Peachcroft shops in North Abingdon, the town bus conked out and had to be towed away – just before the final part of the last circuit.

Round the corner there was already a replacement in position, run by Heyfordian – a Scottish sounding bus company.
Mr Crusty, Jack, and Charlie in town today

At St Helen’s Church this morning Mr Crusty the Donkey was there to help with a big Nativity Tableau with lots of young children dressed as angels and shepherds.

On the Market Place there were two other donkeys, Jack and Charlie, also from the Island Farm Donkey Sanctuary.

I see in the recently published book about Pollyanne, from the sanctuary, that Jack arrived very poorly and emaciated, and it was touch and go whether he would make it through the night. His pulling through was a turning point in setting up the sanctuary.

Polyanne was not in town today but has been on previous occasions. There are two pictures inside the book of Polyanne at the Reynolds Way shops. She walked from there to a church service at Preston Road Community Centre. It’s a busy time of year for donkeys.
Abingon Lock full of bags of gravel
Abingdon Lock chamber is being renovated.

John sent me a picture of some heavy bags of gravel being lowered into the chamber at the far end.

Barriers are there to stop more water getting in. Floods may have hampered progress but work is underway again.

The lock chamber floor is now covered with bags of gravel. (More pictures soon of the renovation.)