Work Progressing on the Open Air Pool

November 29, 2017

Open Air Pool
For two months now, work has been progressing on the £1.3m rebuild of the Abbey Meadows Open Air Pool and changing area.
Open Air Pool
Currently the surrounds are looking very muddy, but the end result will be a pool that should last us for another sixty years (the current pool was dug in the 1950s). The revamped pool will have a beach area, a safer surface, and be heated more efficiently (the pool was first heated in the 1970s).

Filed under: Abbey Grounds

Leave a Comment

(required)

(required), (Hidden)

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

TrackBack URL  |  RSS feed for comments on this post.


Blog Archives

Links