{"id":34576,"date":"2025-11-13T15:27:10","date_gmt":"2025-11-13T15:27:10","guid":{"rendered":"https:\/\/abingdonblog.co.uk\/?p=34576"},"modified":"2025-11-13T15:27:10","modified_gmt":"2025-11-13T15:27:10","slug":"the-white-horse-reservoir-consultation","status":"publish","type":"post","link":"https:\/\/www.abingdonblog.co.uk\/?p=34576","title":{"rendered":"The White Horse Reservoir Consultation"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/www.abingdonblog.co.uk\/imag25\/2025111302.jpg\" \/><br \/>\nThe South East Strategic Reservoir Option (SESRO) &#8211; now renamed the White Horse Reservoir rather than the Abingdon Reservoir &#8211; is currently the subject of a Statutory Consultation. Yesterday there was a display in the Guildhall in Abingdon given by Thames Water, working with Affinity Water.<\/p>\n<p>The Roysse Room, featured models of the reservoir and embankments, and a 3D &#8216;drive-round&#8217; video.<br \/>\n<img decoding=\"async\" src=\"https:\/\/www.abingdonblog.co.uk\/imag25\/2025111304.jpg\" \/><br \/>\nInformation boards were set up in the Magistrates Court.<br \/>\n<img decoding=\"async\" src=\"https:\/\/www.abingdonblog.co.uk\/imag25\/2025111303.jpg\" \/><br \/>\nThere were more design documents and appendices for those who need more details.<\/p>\n<p>The large reservoir proposed near Abingdon has been progressing through the national RAPID \u201cGate\u201d process, which reviews major water-resource schemes at 5 gateway stages to ensure the scheme is viable and affordable and wanted at each gateway before progressing.<\/p>\n<p>At Gate 1 in 2021, the project was confirmed as technically feasible as a concept.<\/p>\n<p>By Gate 2 in 2022, Thames Water had fixed the preferred size at 150 million m\u00b3 and estimated the delivery cost to about \u00a32.2 billion (<a href=\"https:\/\/www.ofwat.gov.uk\/wp-content\/uploads\/2024\/03\/SESRO-case-study.pdf\" target=\"_new\" rel=\"noopener noreferrer\">Ofwat SESRO Case Study<\/a>).<\/p>\n<p>Now at Gate 3 (2024\u201325), after detailed site and engineering work, the projected cost has risen sharply. The consultation documents suggest a range of \u00a35.5\u2013\u00a37.5 billion. (It will be paid for by customers of the water companies over about 100 years.)<\/p>\n<p>This led Vale of White Horse District Council in October 2024 to warn of &#8216;spiralling costs&#8217; and call for a rethink, questioning whether such an expensive scheme is the best long-term solution for the region\u2019s water supply (<a href=\"https:\/\/www.whitehorsedc.gov.uk\/vale-of-white-horse-district-council\/concerns-on-the-spiralling-costs-of-south-east-strategic-reservoir-option-sesro-expressed-at-october-council-meeting\/\" target=\"_new\" rel=\"noopener noreferrer\">VWHDC statement<\/a>).<br \/>\n<img decoding=\"async\" src=\"https:\/\/www.abingdonblog.co.uk\/imag25\/2025111305.jpg\" \/><br \/>\nInside the Guildhall, the case was being put for the reservoir. Outside, a representative of GARD (Group Against Reservoir Development) handed out summaries of the case against.<br \/>\n<img decoding=\"async\" src=\"https:\/\/www.abingdonblog.co.uk\/imag25\/2025111301.jpg\" \/><br \/>\nNew GARD objections, alongside long-standing environmental and community concerns, involve the escalation in cost and the expanding size of the scheme. The reservoir area now requires 38 km\u00b2 of land &#8211; not only for the reservoir itself but also to restore lost biodiversity, relocate solar farms (some will float on the reservoir), mitigate flood risks, and reroute watercourses. <\/p>\n<p>The consultation materials are available online at <a href=\"https:\/\/thames-sro.co.uk\/public-consultations\/south-east-strategic-reservoir-option-sesro-statutory-consultation-2025\/\" target=\"_new\" rel=\"noopener noreferrer\">SESRO statutory consultation 2025<\/a>. The consultation runs to 13th January 2026. <\/p>\n<p>Gard material can be found at <a href=\"https:\/\/groupagainstreservoirdevelopment.org\">groupagainstreservoirdevelopment.org<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The South East Strategic Reservoir Option (SESRO) &#8211; now renamed the White Horse Reservoir rather than the Abingdon Reservoir &#8211; is currently the subject of a Statutory Consultation. Yesterday there was a display in the Guildhall in Abingdon given by Thames Water, working with Affinity Water. The Roysse Room, featured models of the reservoir and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[134],"tags":[],"class_list":["post-34576","post","type-post","status-publish","format-standard","hentry","category-reservoir"],"_links":{"self":[{"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/34576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=34576"}],"version-history":[{"count":0,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/34576\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=34576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=34576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=34576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}