{"id":33913,"date":"2025-06-25T12:15:58","date_gmt":"2025-06-25T11:15:58","guid":{"rendered":"https:\/\/abingdonblog.co.uk\/?p=33913"},"modified":"2025-06-25T12:15:58","modified_gmt":"2025-06-25T11:15:58","slug":"oxford-road-sewer-works-delayed-again","status":"publish","type":"post","link":"https:\/\/www.abingdonblog.co.uk\/?p=33913","title":{"rendered":"Oxford Road Sewer Works Delayed Again"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/www.abingdonblog.co.uk\/imag25\/2025062501.jpg\" \/><br \/>\nThe contractor working to connect sewers for the new North Abingdon housing had a permit to carry out roadworks on Oxford Road from 28 April to 17 September 2025. However, progress has stalled once again.<\/p>\n<p>The delay follows the discovery of an uncharted water main, which now requires a further redesign in coordination with Thames Water. This comes after an earlier redesign caused the project to be postponed  to this summer.<\/p>\n<p>In response, Oxfordshire County Council has cancelled the permit and told the developer to clear the site and return with a revised plan. As a result, it now appears that the works at the Oxford Road roundabout will not be completed any time soon \u2014 though this does not affect the A34 interchange, only the Oxford Road and roundabout.<br \/>\n<img decoding=\"async\" src=\"https:\/\/www.abingdonblog.co.uk\/imag25\/2025062502.jpg\" \/><br \/>\nThe County Council told the contractor to fully open the road by 23 June. As this deadline has not been met (see picture from today &#8211; 25 June 2025), overrun penalties now apply:<br \/>\n* \u00a35,000 per day for the first three days<br \/>\n* \u00a310,000 per day thereafter<\/p>\n<p>The County Council has pointed out that the work has broken some of the agreed rules of the permit, including:<br \/>\n* No one was on site to manage traffic by hand when needed<br \/>\n* Work was done outside the allowed hours<br \/>\n* A safe temporary crossing for pedestrians wasn\u2019t provided<br \/>\n* There were long periods with no work happening and no explanation given<\/p>\n<p>The Council has made it clear that while essential infrastructure work is supported, it must be done responsibly, transparently, and to a high standard.<\/p>\n<p>County and Town Councillors and Highways Officers have played a role in pressing for a new plan for the works and fully opening the road.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The contractor working to connect sewers for the new North Abingdon housing had a permit to carry out roadworks on Oxford Road from 28 April to 17 September 2025. However, progress has stalled once again. The delay follows the discovery of an uncharted water main, which now requires a further redesign in coordination with Thames [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[139],"tags":[],"class_list":["post-33913","post","type-post","status-publish","format-standard","hentry","category-road-works"],"_links":{"self":[{"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/33913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=33913"}],"version-history":[{"count":0,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/33913\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=33913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=33913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.abingdonblog.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=33913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}